New Construction Window Installation
Find out from our knowledgeable product team how to install Pella windows in a new structure or when siding or trim has been completely removed.
New Installation Innovation
Up to 64% of the Installation Can Happen from the Interior with the Pella® Steady Set™ Interior Installation System47
The industry-leading system features easy-to-learn components to help ensure a high-quality, consistent fit and finish every time.
Select Frame Type
Steady Set Interior Installation Instructions
01:22
New Construction Installation After Building Wrap for Steady Set Windows
A window is installed on a stud wall with sheathing after the building wrap is in place. It is then attached using the Steady Set Interior Installation System and integrated with the building wrap using flashing tape.
Instructions
Tips & Tricks
How to Use the Adjustable Bracket
How to Remove Bracket from Receiver
How to Remove Window from Rough Opening
Helpful Resources
- Pella Contractor Program
Pella Contractor Program
- Support Center
Support Center
- Installation Guides
Installation Guides
- Product Warranties
Product Warranties